Every wellsite or pad presents challenges to frac sand logistics. Delays delivering the right sand to the blender can have significant repercussions that increase costs, complicate scheduling, and ultimately can affect execution for the frac job.
The immense task of moving proppant from the mine to the blender is a significant portion of total frac job cost – a cost that is multiplied by the growing volumes of sand used in each hydraulic fracturing treatment. Controlling costs increasingly demands a comprehensive, integrated approach to the entire proppant logistics process.
From the mine to the blender, Hi-Crush combines every element of the proppant supply process to enhance hydraulic fracturing programs with industry-leading standards of quality, reliability, economics and safety.